The three new systems each weigh 52 tons and are 9 meters long. The BigMove partner takes care of the transport and installation. In the future, the exhaust air from…
After installing 5 new wind turbines in the Groß Buchwald wind farm, the heavy goods logistics company takes over the dismantling of the large crawler crane with its technical equipment.
The heavy goods logistics company from Sonsbeck supplies the components for the two power lines SuedLink and SuedOstLink. The transports are handled multimodally and by road via the Niederrhein heavy-duty…
Heavy haulage specialist Colossus is on its way with a 66 ton crawler excavator with lattice boom crane from a construction site in Berlin to the storage area in Colbitz.…